5Dimensional Project Management and Monitoring System is completed with the location quantity tables calculated with 3 dimensional design, the integrated table of discovery, cost analysis for every cost item in the table of discovery, reporting infrastructure built in line with project, employer and subcontractor characteristics and completed stage versatile reporting with comparisons.
BUDGET MANAGEMENT MODULE VALUE ADDS
- Provides faster calculation of cost and profitability analysis with the integration of model and resource data.
- Provides faster integration and revision of design changes with work schedule and budget.
- Provides time-cost optimization at the planning stage.
- Financial risks can be determined faster and earlier so that those risks are minimized or prevented.
- Contract related problems and demands are managed effectively.
- Change “claims” are reduced to a minimum.
- A more realistic cash flow is provided.
- Settlement calculations are done easily as the data is saved in the integrated database.